Renovation

Give your property a new lease of life.

Renovate your property in Portugal, turnkey: design to finished works with partner architects and builders and one point of contact. Request a quote.

  1. 1
    Request a site visitTell us what work you want to do and where.
  2. 2
    We review the work with youAnd we prepare the schedule of works and the quote.
  3. 3
    We take care of everythingDesign, municipal council and building work, through to handing over the keys.
  • 1single point of contact, from start to finish
  • Turnkeywith supervised building work
  • 4.9 customer rating on Google

Request a site visit.

Two steps. We review the work with you and prepare the quote, with no obligation.

What work?
Which property?

Step by step

From the visit to the keys.

  1. 01Site visit

    We look at the property with you and understand what you want to do.

  2. 02Quote

    A clear schedule of works, so the quotes can be compared.

  3. 03Design and permits

    Architecture and, when the work requires it, a licence or prior notification at the municipal council.

  4. 04Supervised building work

    We coordinate builders and suppliers and hand over turnkey.

Turnkey

What we take care of for you.

A single point of contact for the design, the council and the building work.

  • DesignArchitecture and engineering, with our partner architects and engineers.
  • Municipal councilLicence or prior notification, when the work requires it, and the notification of use at the end.
  • Supervised building workWe choose and coordinate the builders and suppliers, with the schedule of works agreed.
  • Energy certificateAt the end of the works, with the home's new class, ready to sell or let.

Only need the certificate? Request a quote for the energy certificate.

Sell

Selling after the works?

A specialist for the area will tell you what the home is worth before and after the works. The valuation is free and with no obligation.

See what my home is worth

Buy

Looking for a property to renovate?

Houses, apartments and buildings for sale across Portugal, with the works planned with us.

View properties for sale

Frequently asked questions

What people ask before the works.

Permits, incentives and quotes, under the 2026 rules.

Have another question?A specialist will answer you today, with no obligation.Call to a Portuguese mobile network
New build: where do you start and what is needed?

First of all, you should consult an architect. An architect has the knowledge and the academic and legal qualifications to assess the investment, draw up the architectural plans and coordinate design and works, making the most of the existing conditions. By planning, managing and coordinating the process, they save you time and worry.

Any new construction is assessed by the public authorities: it is for the municipal councils (câmaras municipais) to receive, examine and approve the application. As there are several legal constraints on building works, the application to the council can start with a request for prior information, a licence application or a prior notification (comunicação prévia). The architectural and engineering designs are submitted at this stage.

Since the planning reform known as Simplex urbanístico (Decree-Law 10/2024), where the zoning plans, the subdivision or the execution unit already set the building rules, and in many consolidated urban areas, works go ahead by prior notification instead of a licence, which is quicker.

Once the licence has been granted, or the prior notification submitted, and the fees paid, work can start, after informing the council that works are beginning. There is no longer a building permit certificate (alvará): the title is the proof of payment of the fees, together with the application and the decision. Always pay attention to the documents required, to having a technician supervise the work and to choosing the builder.

At the end of the works it is no longer necessary to apply for a use authorisation: when the works had a licence or prior notification, you only have to notify the council of the use, with the statement of responsibility from the works manager or supervising manager and the other documents (such as the works log book and the as-built drawings). If you change the use of a property without works that are subject to control, there is a prior notification with a deadline, to which the council may respond.

Architects and engineers are the technicians qualified to produce the designs required (architecture and engineering) and to follow the whole process with the municipal council, from the first idea to completion.

Read more (in Portuguese): Simplex urbanístico 2026: o que mudou no licenciamento de obras.

Do you need the council's permission to renovate the inside of a home?

In most cases, no. Since the Simplex urbanístico (Decree-Law 10/2024), works inside a house or unit that do not change the building height, the shape of the façades or the roof and do not remove façade tiles are exempt from prior control: they need neither a licence nor a prior notification.

Even if they affect the structure, they are exempt as long as a qualified technician signs a statement of responsibility declaring that the work improves or does not harm the structure; keep it, because it may be requested during an inspection. Replacing windows with more efficient ones, with the same design and the same external finish, also no longer needs prior control.

Exempt does not mean without rules: the work must comply with the law, fees may be payable and, since August 2026, the council must be told when the works begin and who is carrying them out. Licences or prior notifications are still needed, for example, for changes to the façade or the roof and for extensions. In apartment buildings, works to the common parts normally need the owners' association's approval, and listed buildings, or those near them, have their own rules.

Every case is different: before you start, check with the municipal council or an architect.

Read more (in Portuguese): Obras que não precisam de licença e as que ainda precisam.

Are there tax incentives for renovation?

Yes. The Portuguese tax benefits statute (Estatuto dos Benefícios Fiscais, article 45) provides incentives for renovating properties that are more than 30 years old or located in an urban regeneration area, provided the work raises the condition of the property by two levels, to at least “good”, and meets the energy efficiency requirements. They include:

  • exemption from IMI (the Portuguese annual municipal property tax) for three years after the works, which the municipality may renew for a further five if the property is let as a permanent home or is the owner's own permanent home;
  • exemption from IMT (the Portuguese property transfer tax, paid by the buyer) on buying a property to renovate, if the works start within three years of the purchase;
  • exemption from IMT on the first sale after the works, if the home is let as a permanent home or, in an urban regeneration area, is the owner's own permanent home;
  • exemption from or reduction of municipal fees, depending on the municipality;
  • VAT at the reduced rate of 6% on urban regeneration contracts in urban regeneration areas or in public interest operations, and on certain works to residential property.

The benefits are not automatic: the renovation has to be recognised by the municipal council, in an application made with the licence or prior notification, and each benefit has its own conditions and deadlines. The rules change with the law and with the municipality: before buying or deciding, check with the council and with the tax authority or a certified accountant.

Read more (in Portuguese): Reabilitar casa antiga: licenças, custos por m² e apoios.

How can you get a building cost estimate close to the real figure?

Before starting the works, or before buying a property to renovate, always ask for a cost estimate, whether it is a new build or a renovation.

Comparing quotes from several building firms is difficult, because each proposes different solutions that are not clear to someone who is not a technician. That is why we recommend first preparing a schedule of works, with the technical solutions, building systems and materials described in detail, and the corresponding specification, which says how and under what conditions the work must be done.

That way, every firm prices the same thing and the quotes can be compared. Because of its technical nature, the schedule of works and the specification should be prepared or supervised by an architect or engineer.

What is the architect's role?

The architect helps solve problems, from the initial idea to its realisation. They carry out studies and designs for buildings, look for the solutions best suited to each case, help you make decisions and work with you to find the solution that best fits your needs.

They are the only professional qualified to produce architectural designs. Whether you are building, renovating a home, extending an office or adapting a small structure, involving an architect is always an asset for the result and for the value of the property. The earlier they are involved, the more they can do.

The architect also makes sure the work complies with the legislation: in most cases they sign a statement of responsibility for the designs they produce, in which they accept the legal and regulatory responsibilities that apply.

Which works add value to a home before selling?

Those that fix problems that put buyers off (damp, plumbing, electrics) and those that improve the first impression, such as painting, the kitchen and the bathrooms. Work that reflects personal taste rarely pays for itself in the price.

Before you decide, a specialist for the area will tell you which are worthwhile in your case and how much the home is worth before and after.

Read more (in Portuguese): Obras antes de vender casa: quais valorizam e quais evitar.